Gate Frame Scaffolding for Masonry Construction/for Building Decoration

Product Details
Customization: Available
After-sales Service: Customer Service
Material: Steel
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
150 RMB
Plant Area
>2000 square meters
  • Gate Frame Scaffolding for Masonry Construction/for Building Decoration
  • Gate Frame Scaffolding for Masonry Construction/for Building Decoration
  • Gate Frame Scaffolding for Masonry Construction/for Building Decoration
  • Gate Frame Scaffolding for Masonry Construction/for Building Decoration
  • Gate Frame Scaffolding for Masonry Construction/for Building Decoration
  • Gate Frame Scaffolding for Masonry Construction/for Building Decoration
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Packaging & Shipping
  • Company Profile
Overview

Basic Info.

Model NO.
METEC-F128
Type
Fixed
Structural Style
Doors Scaffolding
Framework
Frame Combined Scaffolding
Supporting Mode
Projecting Scaffolding
Lapping Form
Double Scaffolding
Erection Position
External Scaffolding
Move Method
Integral Lifting Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Building Scaffold
Certificate
ISO9001
Surface Treatment
Galvanized, Painted, Hot DIP Galvanized,PC
Factory Certificate
SGS TUV
Loading Qty
500PCS
Transport Package
Bundle
Specification
1219*1700 mm
Trademark
METEC
Origin
Wuxi, China
HS Code
730840
Production Capacity
50000 PCS/Year

Product Description


Product Description

 

1. Weld frame scaffolding is made of light duty steel material which has light weight but high strength.

2. All-round frame scaffolding system include 2 PCS of main h frame scaffolding, 2 pairs of cross bars and 4PCS of connect pins,additional steel plank,jack base,caster wheels,etc.

3. Users can install the flexible frame scaffolding in different ways according to different building construction,

4. When used for outside construction, the frame scaffolding can load about 500kg, when used for inside concrete slab construction, the  frame scaffolding standard can load 1Tons per leg, so you can put the frame scaffolding closer if the slab is heavy.

5. This all-around frame scaffolding is widely applied for construction site in the world, especially for African countries.

6.Frame scaffolding is widely use as movable platform,install the caster wheels at the bottom, for inside wall painting and decoration; also applied in building construction ourside.

7.Frame scaffolding is easy assembly and time saving,connecting two H frame by cross brace,lock pins and joint pins

8.Frame scaffolding are dip painted which means that both the inside and outside of the frame scaffolding can be painted to against rust.

9. Frame scaffolding is suitable for supporting the beam, the concrete slab with U Head Jack, and outside decoration.

10.Frame Scaffolding is also a type of mobile scaffolding. You can install caster wheels at the bottom of frame scaffolding, then it can be moved here and there.
Painted Ladder Frame Scaffolding
Item Length x Width (mm) Weight(kg)
H frame scaffolding 1930x1219 12.5-13.5
1700x1219 11.5-12
1700x914 10-10.5
Ladder frame scaffolding 1930x1524 14-15
1700x1219 12-12.5
1524x1524 13-14
1219x1219 8.4-9
914x1219 6.4-7

Leading quality steel construction scaffolding frame
 
1.A set of scaffolding with two pieces of main welding frames, two walking board and 4 cross brace.
 
2.Scaffolding is mainly used for outdoor event, building project, advertisement.It also can be removed with installing caster wheels at the bottom of scaffolding.
 
3.Scaffolding surface with galvanized, painted, powder coating treatment can increase of service life against rust.
 
4.we can provide three types scaffolding, also can making at your request.
 
Product Parameters

 

Product name: Scaffolding
Place of origin: Changge, China
Size:
(Can be customized)
Length(mm) Width(mm) Thickness(mm)
1700 1219 2.0/2.2
1930 1219 2.0/2.2
Material: Q235 steel tube
Surface treatment: Galvanized, powder coating, plated
Welding type: Co2 arc welding
Color: Sliver, red, blue, orange, or at your request
Payment item: 30% TT in advance, the balance before arrange shipping
Delivery time: With 25-30days after the deposit in our account
Packing details: Bare packing, or rely on your request
Capacity: 800 tons per month
 
Packaging & Shipping

1. scaffolding is in bare package, loading in container

2.Loading details:
Height(mm) Container size Sets(Quantity)
1700 20GP 250
1700 40HQ 600
1930 20GP 200
1930 40HQ 550
Company Profile

 

Gate Frame Scaffolding for Masonry Construction/for Building Decoration
Gate Frame Scaffolding for Masonry Construction/for Building Decoration
Gate Frame Scaffolding for Masonry Construction/for Building Decoration







 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier