Steel Tube with Fitting (Twist Lock)

Product Details
Customization: Available
After-sales Service: Customer Service
Warranty: 2 Year
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
150 RMB
Plant Area
>2000 square meters
  • Steel Tube with Fitting (Twist Lock)
  • Steel Tube with Fitting (Twist Lock)
  • Steel Tube with Fitting (Twist Lock)
  • Steel Tube with Fitting (Twist Lock)
  • Steel Tube with Fitting (Twist Lock)
  • Steel Tube with Fitting (Twist Lock)
Find Similar Products
  • Overview
  • Company Profile
  • Detailed Photos
  • Our Advantages
  • FAQ
Overview

Basic Info.

Model NO.
tube
Material
Steel
Type
Mobile
Structural Style
Multi-Pole Scaffolding
Framework
Combined Scaffolding
Supporting Mode
Wall Hanging Scaffolding
Lapping Form
Full Scaffolding
Erection Position
Internal Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffold
Construction Properties
Installation Scaffold
Certificate
Ce
Factory Certificate
ISO9001
Transport Package
Package/ Steel Pallets
Specification
OD48.3 X 3.2mm
Trademark
METEC
Origin
Wuxi, China
HS Code
730840
Production Capacity
80 Containers/ Month

Product Description

METEC is one Scaffolding Manufacturer who managed strictly inaccordance with ISO9001-2000 quality management system. Our system tubes are manufactured specifically to the standard of ASTM AA513-07 and our couplings meet BS1139 and EN74.2 standard. Every delivery of products will have to undergo strictpressure testing and loading testing before being sent out to customers. Our standards and ledgers of scaffolding products are fully welded by machine, resulting inclear, flat and seamless products. Our welders are well trained by AWSD1.1 to standardize Butt Jointwelding, Semi-Auto Fillet Welding and Auto Fillet Welding.

At present, our company has developed more than 800 types scaffolding and accessories. We are one of only a very few companies who can offer such a complete range ofscaffolding products. Having some of Chinese best engineers specializing inscaffolding, our company offers design through to product design and many otherhelps along the way.

Please check our web site for more information.
http://metecmetal.en.made-in-china.com

 
Description Weight (kg)
Steel Tube with Fittings 4' 4.51
Steel Tube with Fittings 6' 6.36
Steel Tube with Fittings 8' 8.24
Steel Tube with Fittings 10' 9.80
Steel Tube with Fittings 13' 12.55


Features:
1. Standard: Made of 48mm O. D. X 3.2mm thickness high grade steel tube, 1 cup 0.5meter, Length: 3000, 2500, 2000, 1500, 1000, 500mm etc.
Available, and can be to ordered by you,
2. Ledger: Made of 48mm O. D. X 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.
3. Cup: Made from cast-steel or pressed steel
4. Ledger connection-peg: Made from cast-steel,
5. Base screw jack: Length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.
6. U head screw jack: Length600mmx3.5mmthickness strength tube with U head plate, length can to be order, solid tube available.
7. Surface: Painted/cold (hot) dipped galvanized or to be order
8. Also can manufacture it as your requirement

Standard/Vertical
CV910   VERTICAL 9'10" (3M) - 6 CUPS HDG
CV82   VERTICAL 8'2" (2.5M) - 5 CUPS HDG
CV66   VERTICAL 6'6" (2M) - 4 CUPS HDG
CV411   VERTICAL 4'11" (1.5M) - 3 CUPS HDG
CV33   VERTICAL 3'3" (1M) - 2 CUPS HDG
CV10   VERTICAL 1'7" (0.5M) - 1 CUP HDG
 
Horizontal Runners
CH100 HORIZONTAL 10' (3048MM) HDG
CH90 HORIZONTAL 9' (2743.2MM) HDG
CH82 HORIZONTAL 8'2" (2500MM) HDG
CH80 HORIZONTAL 8' (2438.4MM) HDG
CH70 HORIZONTAL 7' (2133.6MM) HDG
CH60 HORIZONTAL 6' (1828.8MM) HDG
CH511 HORIZONTAL 5'11" (1800MM) HDG
CH50 HORIZONTAL 5' (1524MM) HDG
CH411 HORIZONTAL 4'11" (1500.2MM) HDG
CH41 HORIZONTAL 4'1" (1250MM) HDG
CH40 HORIZONTAL 4' (1219.2MM) HDG
CH36 HORIZONTAL 3'6" (1066.8MM) HDG
CH30 HORIZONTAL 3' (914.4MM) HDG
CH27 HORIZONTAL 2'7" (788.19MM) HDG
CH211 HORIZONTAL 2'11" (900MM) HDG
CH110 HORIZONTAL 1'10" (559.59MM) HDG
 
Swival clamp brace
CCB100 CLAMP BRACE 10' BAY (3048MM) HDG
CCB90 CLAMP BRACE 9' BAY (2743.2MM) HDG
CCB86 CLAMP BRACE 8'6" BAY  HDG
CCB82 CLAMP BRACE 8'2" BAY HDG
CCB80 CLAMP BRACE 8' BAY HDG
CCB70 CLAMP BRACE 7' BAY HDG
CCB60 CLAMP BRACE 6' BAY HDG
CCB50 CLAMP BRACE 5' BAY HDG
CCB30 CLAMP BRACE 3' BAY HDG
 
Face brace
CFB100 FACE BRACE 10' (143.53" C-C) HDG
CFB90 FACE BRACE 9' (133.66" C-C) HDG
CFB82 FACE BRACE 8'2" (126.05" C-C) HDG
CFB80 FACE BRACE 8' (124.16" C-C) HDG
CFB70 FACE BRACE 7' (115.14" C-C) HDG
CFB511 FACE BRACE 5'11" (105.93" C-C) HDG
 
 
 
Company Profile

 

Company Wuxi Metec Metal Co., Ltd.
Product Ringlock system, cuplock system, frame system,work platform ,props, steel plank, scaffolding accessaries,tube and clamps
Certification CE/ TUV / ISO9001-2000 / SGS,
Service OEM / ODM
Principle Reliable quality, strict management ,  superb technology ,  reasonable price , excellent service
Website http://metecmetal.en.made-in-china.com
Metec Scaffolding has developed more than 800 types scaffolding and accessories.We are one of only a very few companies who can offer such a complete range of scaffolding products. Having some of China's best engineers specializing in scaffolding, our company offers design through to product design and many other helps along the way.
Our standards and ledgers of scaffolding products are fully welded by machine, resulting in clear, flat and seamless products. Our welders are well trained by AWS D1.1 to standardize Butt Joint welding, Semi-Auto Fillet Welding and Auto Fillet Welding.
We are one of only a few companies that offer scaffolding products to be able to work under extreme weather condition, such as up to -40 dig encountered in Canada that our material of tubes are booked specially from steel factory.
 
Detailed Photos

 

Steel Tube with Fitting (Twist Lock)
Steel Tube with Fitting (Twist Lock)
Steel Tube with Fitting (Twist Lock)
 
Our Advantages

 

More than 10 years 'exportation experience
30,000 tons annual capacity
With ISO9001-2000 quality management system
TUV/GS, CE Certificate
Every batch of products will have to undergo strict pressure testing and loading testing before being sent out to customers
We are committed to the establishment of and overseas customers and maintain long-term business relationship. We fully understand each customer .There are different requirements for specific products. So from the early we will set up a professional knowledge and skills of the sales team.



Steel Tube with Fitting (Twist Lock)
FAQ

 

Q1: Are you a factory or trading company?
A: We are the manufacturer of ringlock & cuplock scaffoldings for more than 15 years.

Q2: Where is the loading port?
A: Shanghai port

Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one container is preferred.

Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS, and TUV certification.

Q5: Can I get some samples?
A: Yes, Sample is free, but usually the customer will pay for the shipping cost.

Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.

Q7: How long is the production cycle after ordering?
A: General it is about 20-30 days.

Q8: What is the payment methods?
A: T/T payment is preferred and other payment terms is accepted.



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier